Office relocation and installation by Source COI
Office Relocation

Movers Who Are Furniture Experts First

San Diego · Los Angeles · Irvine · Orange County · Nationwide

01 / The Approach

A Move Should Not Be a Source of Stress

Every desk, workstation, and conference table has to come apart, travel, and go back together while your business keeps running. That is the whole job.

Source COI is a commercial furniture specialist first and a mover second. Our crews include certified installers who know how each piece is built, how it comes apart, and exactly how it goes back together at the other end.

The result is a move where nothing is damaged, nothing goes missing, and your new office performs on day one. We relocate businesses across San Diego, Los Angeles, and Irvine, and manage long distance moves nationwide.

1988
Moving Offices Since
In-House
Certified Install Crews
Local
Plus Cross-Country Moves
Office furniture installed by Source COI
Workspace set up after an office move
Source COI certified furniture installers
02 / Why Source COI

Most Movers Treat Furniture as Cargo

They wrap it, load it, and hand it off. We treat it as an investment that has to arrive perfect and be installed precisely right.

  • Certified installers handle your furniture, not a general moving crew
  • Labeled and inventoried components, so nothing goes missing in transit
  • Installed to your floor plan, not delivered and left in boxes
03 / Scope of Service

What Our Relocation Service Covers

End to end, from the first planning call to the final walkthrough at your new address.

Pre-move planning Before the Move

Planning & Coordination

We map every piece of furniture, elevator window, parking constraint, and move-in slot, and coordinate with building management at both ends before a single box appears.

Packing and disassembly Pack & Protect

Packing & Disassembly

Quality boxes, custom padding for fragile items, and full disassembly of workstations and systems furniture. Every component is labeled and inventoried for fast reassembly.

Commercial transportation In Transit

Commercial Transportation

Vehicles and crews for moves of any size, whether you are shifting floors, crossing town, or relocating to another state.

Furniture installation at the new space At the New Space

Furniture Installation

Our install team rebuilds every workstation, desk, and conference room to your approved floor plan. A complete installation, not a delivery and a handoff.

Technology coordination Technology

Equipment Coordination

Monitors, printers, phones, and server components packed, moved, and positioned so your IT team can reconnect quickly.

Post-move cleanup After the Move

Cleanup & Debris Removal

We clear the boxes and packing materials so your team walks into a finished office, not a construction zone.

Furniture installed correctly after a move
04 / The Difference

Installed, Not Just Delivered

The most common complaint after a commercial move is damaged furniture. The usual culprits:

  • Panels that no longer fit back together
  • Desks that wobble because a component went missing
  • Workstations rebuilt wrong by a crew that had never seen them

We have handled thousands of installations, new builds and relocations alike. Knowing how furniture goes together is what makes taking it apart safe. We will also tell you what is worth moving and what should be replaced at the new space.

05 / Every Type of Move

However You Are Moving

The same planning, packing, and installation standard applies at every scale.

01 / Local

Same City or Building

Local moves get the same rigor as any other project, including detailed planning, expert disassembly, and full reinstallation.

02 / Long Distance

Statewide & Cross-Country

A logistics framework that gets your furniture there safely and on schedule, whether that is across California or coast to coast.

03 / Phased

Department by Department

Larger moves often run over weeks. We sequence each phase so operations continue and momentum holds.

04 / Corporate

Multi-Location Moves

Project management across sites, aligning timelines and vendors so every office in the move lands smoothly.

05 / Furniture Only

Reconfigure or Redeploy

Shifting or redeploying specific pieces within your current space or to a second location, handled with the same care.

06 / Storage-Backed

Move Out Before Move In

When the new space is not ready, your furniture waits in secure, inventory-tracked storage and deploys on your timeline.

06 / Keep Working

Minimizing Downtime

Every hour your team cannot work costs money and momentum. The plan is built to protect those hours.

Off Hours

Evenings and Weekends

We move outside business hours whenever possible, so your team never loses a working day to the transition.

In Parallel

Crews Working at Once

Workstations, conference rooms, and common areas are set up simultaneously so the new space comes together fast.

Communication

One Line to Your Office Manager

Clear internal updates throughout, with issues resolved the moment they surface rather than after the fact.

Secure office furniture storage
07 / Bridging the Gap

Storage When Timelines Slip

Construction runs late. Elevator windows shift. Installation has to be phased. Nearly every move meets at least one of these.

Your furniture waits in a secure, organized facility with full inventory tracking, ready to deploy the moment the new space is. Storage is built into the plan from the start rather than added when the schedule moves.

Completed office after a Source COI relocation
08 / Where We Move

Southern California and Nationwide

Based in Irvine, with the local knowledge to plan around each market's buildings, docks, and elevator rules.

CA / 01
San Diego
Downtown to Sorrento Valley, La Jolla to Chula Vista. We plan around local loading dock and elevator constraints.
CA / 02
Los Angeles
High-rises, strict move-in windows, and traffic that can eat a day. Century City to El Segundo, planned around every obstacle.
CA / 03
Irvine & Orange County
Moving businesses through the county's office parks and campuses since 1988, from the Spectrum to Newport Beach.
US / 04
Long Distance
Cross-country moves with vendor coordination, transport, storage, and installation handled as precisely as a local job.
09 / Details

Frequently Asked Questions

Still have a question about your relocation? We are happy to walk through it.

Book a Consultation

Sixty to ninety days out for most moves. Larger relocations involving multiple departments, long distance transport, or complex furniture systems benefit from four to six months.

Yes, completely. Everything is disassembled, labeled, packed, and inventoried, then rebuilt and positioned to your floor plan at the new address. You do not need a separate installation crew.

Yes, for furniture and general office equipment. We can also split the work, handling furniture and equipment while your team packs personal items.

Common, and we plan for it. Your furniture goes into secure storage with full inventory tracking and deploys to the new space on your timeline.

Yes. Across California, out of state, or coast to coast. Our team coordinates every phase from packing through installation at the new location.

Moves run outside business hours where possible, crews work in parallel, and we coordinate closely with your office manager so everyone knows what to expect and when.

We are a commercial furniture specialist that also relocates offices. Our crews include certified installers who understand how office furniture is engineered, which changes how it is taken apart, protected, and rebuilt.

Plan Your Relocation

A Move Your Team Barely Notices

Professionally planned, expertly installed, and built to have everyone working in the new space without missing a beat. We serve San Diego, Los Angeles, Irvine, and all of Southern California, plus long distance moves nationwide.